The Finish Line is Within Sight!

So me and The Kid have been putting some real effort into finishing this dollhouse and we’re getting very close. I am hoping to have the bulk of it done by the end of the weekend. I am so ready for this project to be done and over with… and I can get my entry way back!

So, updates: The floors have been done in the bathroom and the bedroom. Laid 2″ square tiles in the bathroom and then grouted with caulk. Because the house still needs to be delivered and therefore undergo some critical traveling, I didn’t want the grout to break or crack so thought that the caulk would be a much better solution. DSCN1853Here is a quick shot of the tile installed. I used Liquid Nails to adhere it, not standard practice for the installation of tile but a good solid decision based on the size of the room and the number of tiles.

DSCN1855Here is the floor with the caulk ‘grout’. I am really liking the clean look of the tile.

DSCN1857Here it is with the baseboard trimming. Isn’t this sweet? And The Kid did a great job of making a door transition and gluing and then grouting the space between the bathroom and the bedroom.

DSCN1858A little bit of clean up to do and it is ready to be staged. You can see in this photo that the floor has been stained (two coats) and then polyurethaned (two coats) and the trim also installed. It, too, is ready for furniture!

DSCN1836You may recall that I started work on the love seats, I wanted to show you how I applied 1″ foam to the pieces to get ready for upholstery. One piece wraps up from the seat and over, all the way to the bottom. A couple of staples and lots of glue, a few clips to hold it in place while it dries.

DSCN1847DSCN1846

Next, I wrapped both arms with the same foam. This time I used clamps in addition to the staples, clips and glue to hold things together until they dried.

DSCN1848 DSCN1849

Both loveseats got similar treatments with the foam on the front (forgot the photos). But they have been relocated to my sewing room for the upholstery work. Probably won’t get to them until we finish the work on the house and its ready to be furnished. Additional photos promised.

DSCN1850This is the side and back view of the third floor. Slowly this piece is coming along. You can see that I am toying with ideas for how to “roof” the angled pieces, and at this point, have not settled on a solution.

DSCN1861

I stumbled across the most wonderful little piece of furniture. It actually had three small photo albums in it, but it is going to be transformed into a fireplace. Which means, at some point, I need to scout “fire wood” for it. I also need to figure out how to put floor moulding with the tricky angles, but The Kid thinks he has a way. Ah, I love that Kid!

I won some glassware at a local auction, in additional to a 12 foot x 30″ purple counter top (all for the grand sum of $15!) that I have plans for. But… like I have said many times, no new projects started until this doll house is completed. Now that I have this quick update written, I am going to go work on the kitchen’s lower cabinets and get them ready for installation. Once that happens, then I can do the tile countertops, get the sink installed and complete the trim around the edges. Then its just a matter of details! I can see the finish line!

Once this has been done, it is going up for sale. If you are in the market for a custom doll house, watch this space. I have been thinking about the logistics of getting this shipped or (my choice) delivered, I know that whoever is the recipient of this gift is just going to love it. And just in time for Christmas!

Okay, thanks for stopping by and for following my progress. Remember to keep making beautiful things for the sake of beautiful things! And of course, I’d love to hear any ideas you might have for finishing touches!

Thanks again!

julie

Gaining Ground on the Dollhouse Project

Today is one heckuva warm day – been this warm for several days. Makes me not want to do anything in the garage or outdoors. I send the Kid out with birdseed and water for the birdbath and regularly send him out to water the strawberries and his peppers. Just too dang hot to be out there long.

So, I opted to move the dollhouse inside. As you may recall, I had started work on a second dollhouse after delivering the first one to my grandniece. If you’ve not seen it, you can see it here.

I’ve mentioned the second doll house occasionally, my first thought was to duplicate much of the work and design from the first one, but as I’ve gotten started, it has quickly become a monster! Here is the second one in early steps:

dscn1423The top shelf was to be a kitchen and the bottom was supposed to have a bedroom and a bathroom. My plans for the kitchen soon outgrew the space and it also bothered me that the part that a little girl would play with was so high off the ground.

My son and I put together the basic construction for my second attempt at this house. Looks like this:

DSCN1714

Yes, this would give me the added space that I wanted. So, this morning I listed the first piece on Craigslist and moved the box into its space in the entry way.

DSCN1785

The cabinets that I had been assembling was pretty haphazard, working with two different pieces that I found at Hobby Lobby, I just sort of ‘put that here, place that there’ approach. I’ve had to do some trimming and adding to get everything to fit together properly and its just sort of taken on a life of its own!

These are the pieces I found and am using from Hobby Lobby:

649442_1I’ve turn the drawer unit on its side and removed some drawer supports to make the lower cabinets (where the sink is going). The window units became the upper cabinets. Its all just random and I need to reign it in before it becomes too much! They will, in the end, become white and have a actual tile counter. The cabinet between the stove and ‘fridge will have a wood top for chopping. And with mention of the stove and ‘fridge, you can see them in the photo, they are the most perfect shade of turquoise!

Here’s a little better shot:

DSCN1784I had hoped for room for a dining room table, maybe booth style, but now am thinking there really isn’t room. Maybe I’ll do a pub table with stools against the wall? Guess I will see what I find that will work. But the cabinets and ‘fridge will be stocked with polymer food and scaled down boxes and bottles. Attention to detail will be evident.

The bottom portion will be a bedroom and bath. I have most of the required furniture and pieces and it is just a matter of painting walls and installing flooring. There is yet to be an upper room/attic, in this style:

ea7ef63cdedd363d4bbf7a32079fc709I cannot locate the original link for this piece, so if you know it, please send it along (I like to give credit where credit is due.) I like the simplicity of the outside and I am actually thinking that my cabinet exterior will simply be stained, since I used a high grade plywood. Will make it more of a piece of furniture.

UPDATE: A big thanks to a fellow blogger (http://kitchencasualties.blogspot.com) I now have the link to the doll house above. You can seeĀ it on easy.com here.

In case you were wondering, this piece will be for sale in the near future. I just like the planning and execution of an idea. If you’re interested, let me know. I hate to say it, but the price tag for this piece – which will include all the furniture and accessories – will be high. It isn’t often that you will find something like this for sale.

Okay, enough for now. Need to get the first coat of paint onto the cabinets as I’ve gotten it all primed. One day, I will actually get my kitchen and entry way back!

Thanks for dropping by!

julie

%d bloggers like this: